Case Studies

Feb 15, 2018

 

Previously, New College Group (NCG) were split into two different sites with weak network connections, slow computers and inadequate systems. They decided to move in early-September and required a brand new network infrastructure, high speed connections and efficient computer systems.

Read more...

description: As a company with weak network connections, slow computers and inadequate systems, how could New College Group ensure that their IT infrastructure was the standard it needed to be? Find out how Comms-Byte turned all of this around. The same can be done fo

Feb 15, 2018

The practice owner, Claire, wanted to expand the practice into a new premise in Marple Bridge. The new office needed new computers and required a Network setting up.

Read more...

description: The practice owner, Claire, wanted to expand the practice into a new premise in Marple Bridge. The new office needed new computers and required a Network setting up. Read more how Comms-Byte turned this challenge around.

Feb 15, 2018

The business, Quadriga Contracts Ltd, currently have single monitors but require dual monitors as they feel that this will help them to work more efficiently. Although they want dual monitors they feel that they do not have enough desk space for this to happen.

Read more...

description: Get the most out of your IT equipment, increasing your work efficiency and productivity. Upgrading to dual monitors for Quadriga has meant they can work on more than one task at once. Find out how Comms-Byte made sure all of this ran smoothly with sourced equipment and installation.